Reconstruction of the hot water line
Project location: ul. Slezská, Hradec Králové
Year of realization: 2020
Amount of investment in CZK without VAT: 13 200 000
Year energy savings in %: Neudáno
Year financial savings in CZK: Neudáno
Reconstruction of the existing canal hot water line, which was replaced by a pre-insulated distribution DN 200-DN 250 with a route length of 490 m, was carried out in the heat supply system of Elektrárny Opatovice, a.s. in Slezská Street in Hradec Králové.
The delivery also included all earthworks and construction work, project work, engineering and geodetic work.